The Shift Dates window is used to shift the start and/or due dates of a selected top-level gate and all its dependents by a specified duration of days or months. The dates can be shifted forwards (later) or backwards (earlier). This option is available only when a top-level gate with no precedent gate is selected. For information about precedent gates, see DFR Gate Properties Window.

For example, if you selected the "Concept Phase" gate highlighted below and made the selections shown, then the start and due dates of every gate shown would be shifted forward by 15 days (e.g., from 1/1/2011 to 1/16/2011).

 